{"created":"2023-06-19T11:38:34.509469+00:00","id":6290,"links":{},"metadata":{"_buckets":{"deposit":"aadb2dfd-8efe-40c4-ad1c-4333c8d45b8b"},"_deposit":{"created_by":13,"id":"6290","owners":[13],"pid":{"revision_id":0,"type":"depid","value":"6290"},"status":"published"},"_oai":{"id":"oai:mie-u.repo.nii.ac.jp:00006290","sets":["420:421:498:499"]},"author_link":["14281"],"item_4_biblio_info_6":{"attribute_name":"書誌情報","attribute_value_mlt":[{"bibliographicIssueDates":{"bibliographicIssueDate":"1980-12-01","bibliographicIssueDateType":"Issued"},"bibliographicPageEnd":"271","bibliographicPageStart":"259","bibliographicVolumeNumber":"61","bibliographic_titles":[{"bibliographic_title":"三重大學農學部學術報告 = The bulletin of the Faculty of Agriculture, Mie University"}]}]},"item_4_description_14":{"attribute_name":"フォーマット","attribute_value_mlt":[{"subitem_description":"application/pdf","subitem_description_type":"Other"}]},"item_4_description_4":{"attribute_name":"抄録","attribute_value_mlt":[{"subitem_description":"In order to analyze the Tractor skidding system in the selective cutting stand of natural forests, the quantification method in which the outside criterion is given in terms of quantity was practically applied. The suitability of application of this theory and its techniques was investigated. Also the theorization for the new techniques of work study to make this skidding system most suitable was demonstratively investigated. This was done by using data of 42 systems of the skidding operation which was recently carried out in the national forests within the province of Hokkaido regional forest office and Obihiro branch regional forest office. \nThe results obtained by this investigation are summarized as follows: \n(1) By means of the best quantities {tjk} determined for the category Cjk as the conditional factors of operation, the complicated relationship between labour productivity and the conditional factors of operation in the Tractor skidding system could be solved. \n(2) The predictable model of labour productivity correspdnding to the conditions of operation was designed by the results of analysis. Therefore, when this skidding operation must be planned, if the conditional factors of operation in the skidding area are investigated, labour productivity in this skidding operation can be predicted plurally by this model. This model is shown in Table 5, and the results of correspondence between the values of investigation and the values of estimation of labour productivity in the step of 10 factors are shown in Table 7. \n(3) It is possible to make the working system most suitabte to this skidding operation, because the most suitable conditional factors of operation can be determined.\n(4) It was demonstrated that the application of this theory and techniques for the analysis of this skidding system was also proper, because the value of the multiple correlation coefficient which denotes synthetically the precision of estination in the quantification method is 0.927 in the step of 10 factors. \n(5) By means of the values of the multiple correlation coefficient, partial correlation coefficient, partial correlation coefficient of factors and deviation, the theorization for the new techniques of work study to make this skidding system most suitable could be demonstratively made. \nThese five points indicate that the applications of the quantification method are very valuable for a rational plan of this skidding operation and system in forest management by the non-clear cutting method.","subitem_description_type":"Abstract"}]},"item_4_publisher_30":{"attribute_name":"出版者","attribute_value_mlt":[{"subitem_publisher":"三重大学農学部"}]},"item_4_source_id_7":{"attribute_name":"ISSN","attribute_value_mlt":[{"subitem_source_identifier":"0462-4408","subitem_source_identifier_type":"PISSN"}]},"item_4_source_id_9":{"attribute_name":"書誌レコードID","attribute_value_mlt":[{"subitem_source_identifier":"AN00234337","subitem_source_identifier_type":"NCID"}]},"item_4_subject_16":{"attribute_name":"日本十進分類法","attribute_value_mlt":[{"subitem_subject":"651","subitem_subject_scheme":"NDC"}]},"item_4_text_18":{"attribute_name":"その他のタイトル","attribute_value_mlt":[{"subitem_text_language":"en","subitem_text_value":"Studies on the Working System in the Felling and Yarding Processes (Part 6) : Analysis of the Tractor Skidding System by Quantification Method"}]},"item_4_text_63":{"attribute_name":"ノート","attribute_value_mlt":[{"subitem_text_value":"Agropedia提供データ"}]},"item_4_text_65":{"attribute_name":"資源タイプ(三重大)","attribute_value_mlt":[{"subitem_text_value":"Departmental Bulletin Paper / 紀要論文"}]},"item_4_version_type_15":{"attribute_name":"著者版フラグ","attribute_value_mlt":[{"subitem_version_resource":"http://purl.org/coar/version/c_970fb48d4fbd8a85","subitem_version_type":"VoR"}]},"item_creator":{"attribute_name":"著者","attribute_type":"creator","attribute_value_mlt":[{"creatorNames":[{"creatorName":"飛岡, 次郎","creatorNameLang":"ja"},{"creatorName":"Tobioka, Jiro","creatorNameLang":"en"}],"nameIdentifiers":[{}]}]},"item_files":{"attribute_name":"ファイル情報","attribute_type":"file","attribute_value_mlt":[{"accessrole":"open_date","date":[{"dateType":"Available","dateValue":"2017-02-18"}],"displaytype":"detail","filename":"AN002343370006109.pdf","filesize":[{"value":"670.6 kB"}],"format":"application/pdf","licensetype":"license_note","mimetype":"application/pdf","url":{"label":"AN002343370006109.pdf","url":"https://mie-u.repo.nii.ac.jp/record/6290/files/AN002343370006109.pdf"},"version_id":"519a5a3d-a7ee-4a40-9e51-c39085e08baf"}]},"item_language":{"attribute_name":"言語","attribute_value_mlt":[{"subitem_language":"jpn"}]},"item_resource_type":{"attribute_name":"資源タイプ","attribute_value_mlt":[{"resourcetype":"departmental bulletin paper","resourceuri":"http://purl.org/coar/resource_type/c_6501"}]},"item_title":"伐木集材工程の作業仕組に関する研究 (第6報) : 数量化の方法によるトラクタ集材作業システムの解析","item_titles":{"attribute_name":"タイトル","attribute_value_mlt":[{"subitem_title":"伐木集材工程の作業仕組に関する研究 (第6報) : 数量化の方法によるトラクタ集材作業システムの解析","subitem_title_language":"ja"}]},"item_type_id":"4","owner":"13","path":["499"],"pubdate":{"attribute_name":"PubDate","attribute_value":"2007-03-29"},"publish_date":"2007-03-29","publish_status":"0","recid":"6290","relation_version_is_last":true,"title":["伐木集材工程の作業仕組に関する研究 (第6報) : 数量化の方法によるトラクタ集材作業システムの解析"],"weko_creator_id":"13","weko_shared_id":-1},"updated":"2023-10-13T04:07:23.003156+00:00"}